Trenching

trenching1 trenching2

16 metres of trench dug for a sewer pipe at a depth of 2m with 1:40 gradient. Trench 12 inches wide ready for pipe laying and backfilling.
Soil very stony with large amounts of flint and chalk.

Time taken for completion 1 day